Why this is relevant — Fiber optic assemblies share the rapid prototyping precision discipline this energy storage program required.
A German energy storage SME needed urgent prototype samples for a new 2-pin battery connector assembly to meet an aggressive project milestone.
- Challenge
- The customer required a very short lead time of just 12 days for delivery of 100 custom assemblies to meet a critical project deadline.
- Solution
- Expedited the manufacturing and logistics process to prioritize the custom 2-pin assembly run, ensuring the prototype batch was produced and shipped within the tight window.
- Result
- Successfully delivered the 100-piece prototype batch within the 12-day deadline, enabling the customer to proceed with their project validation on schedule.
- 12-day lead time
- 100-piece sample quantity
- 2-pin custom assembly