Why this is relevant — CAN bus harnesses share the high volume cable production impedance-control discipline this test measurement case required.
A North American high-tech industrial client required a high-temperature probe cable with stricter tolerances than their standard variant.
- Challenge
- Manufacturing a high volume of spools with tighter tolerances while maintaining a standard production lead time and ensuring consistent quality across the entire batch.
- Solution
- Aligned production processes to meet the strict tolerance requirements and coordinated a multi-PO repeat program to ensure consistent quality and on-time delivery for the high-volume spool order.
- Result
- Delivered the full volume of spools meeting the tightened tolerance specs within the 4-5 week lead time requirement.
- 1440 spools
- 30 meters per spool
- tighter tolerances
- 4-5 week lead time

