A German industrial electrical systems integrator required cable harnesses for a high-volume annual program but faced sourcing constraints on specified connectors.
- Challenge
- The originally specified STOCKO connectors faced procurement limitations, and the required PTC components (EPCOS B59100A1080-A40) had a long 12-14 week lead time, threatening the overall project timeline for a 200kpcs/year program.
- Solution
- Proposed Lumberg connectors as a qualified alternative to STOCKO. Provided detailed specification comparisons and emphasized Lumberg's shorter MOQ and better delivery times to offset the PTC lead time bottleneck, while remaining transparent about the slightly higher price point of the alternative.
- Result
- The customer accepted the alternative for evaluation, agreeing to sample the Lumberg-based assemblies, which kept the high-volume annual program viable despite initial component sourcing bottlenecks.
- 100kpcs/year per product (200kpcs total annual volume)
- PTC model: EPCOS B59100A1080-A40
- PTC lead time: 12-14 weeks
- Connectors evaluated: STOCKO vs. Lumberg