Why this is relevant — Blast detection cables share the high mix low volume manufacturing ruggedization discipline this mining program demanded.
An Australian mining equipment integrator sought a supplier for custom low-to-moderate volume wiring harnesses, with projected significant volume scaling over a three-year horizon.
- Challenge
- The client needed a supplier capable of handling initial low-volume prototype runs while supporting a rapid scale-up to high volumes, all while competing against their existing vendor base.
- Solution
- Provided a competitive quotation for the initial low-volume order with a 4-week lead time, demonstrating manufacturing flexibility for low-volume starts and outlining capacity planning for future volume scaling.
- Result
- Successfully entered the vendor evaluation shortlist, with the client initiating parallel inquiries for additional projects and planning a factory audit to finalize the long-term partnership.
- 20 sets initial order
- 4-week lead time
- Forecast: 50 sets in 2026
- Forecast: 500 sets in 2027
- Forecast: 1000 sets in 2027